13.5 AZN
For bath-houses, toilet rooms, balconies, and technical water reservoirs.
Composition of powder: Cement based dry mixture resistant to chemicals. Composition of liquid: Acrylic based emulsion polymer. The product conforms to the requirements of the TS AZS 31 43498-05-2005 specifications. For bath-houses, toilet rooms, balconies, and technical water reservoirs.
This insulating mixture can be applied in the following areas:
Preparation of surface. Clean the surface from any residues deteriorating adhesive force. Pay attention to ensuring rigidity of the surface. In case the surface to be used has any defects, they should be removed using MATON 100 repair mixture. Before application of the product the surface should be primed with BINMADER primer.
Preparation of the mixture. Carefully pour 25 kg powder mix into 10 liters of white liquid composite and mix till it is entirely homogeneous (to prepare the mixture it is recommended to use slow circulation mixer). Wait 3-5 minutes to allow complete mixing of the substances composing the mixture, mix again before application.
Application. Spread the prepared mixture over the surface in two layers using roller or brush. The layers should be applied perpendicular to each other. The time between application of layers may be 5-6 hours, depending on the ambient temperature. To prevent formation of cracks in the corners of the product application area, the oval shape should be given to the corners, and the mixture should be reinforced with mesh. The prepared mixture should be used within 3 hours. Do not use the mixture after expiration of this period.
Recommendations. The surface treated with the mixture should be protected from direct sun rays, precipitations and dust for 48 hours, and the product should not be used in the areas of direct solar radiation. As the product is applied in thin layers, after its application onto the surfaces to be subject to pedestrian flows and vehicles traffic it should be treated with protective facing materials, such as concrete flooring plaster and ceramic tiles. The surfaces should be put into operation or covered with facing plates in at least 1 week after application of the mixture.
The İzoLatexe Eko waterproofing mixture is applied onto the surface in 2 layers.
First layer consumption: 1.2 kg/m2.
Second layer consumption: 1.0 kg/m2.
The powder composite component can be stored during 12 months packed in original sacks in dry conditions on wooden racks, maximum 10 sacks per rack, and the liquid component can be stored during 12 months in plastic cans placed one upon the other in three layers.
After registering on the site, you will be able to track the status of orders, your personal account and other new features
Məhsul haqqında rəy əlavə edin