26.7 AZN
Cement based crystallizing waterproofing plaster capable to repair cracks, suitable for application on concrete layer of newly built and old walls to prevent penetration of water.
Cement based crystallizing waterproofing plaster capable to repair cracks, suitable for application on concrete layer of newly built and old walls to prevent penetration of water. The product conforms to the requirements of the TS AZS 31 43498-05-2005 specifications.
This insulating product can be applied in the following areas:
Preparation of the surface. The cement based surfaces being in contact with water should be healthy, rigid, clean, dust-free, and should have suitable dimensions. The surface should cleaned with water and should be totally free of any fat, rust, paraffin, and other substances deteriorating adhesive force, then it should be finely perforated to increase the adhesive force. Small metal and wooden particles should be removed from the surface. In case the surface has any cavities, they should be removed with MATON 100 repair mixture. Thoroughly soak the clean surface with water, and do not use it until it is totally dry.
Preparation of the mixture. First pour the IzoKrist powder into clean mixing container, and gradually add water for 3-5 minutes using 400-600 RPM mixer till the solution is entirely homogeneous. Mix again in approximately 3-5 minutes during 30-second period, bringing the product to conditions ready for application. Prepare the solution in the amount required for application within 20 minutes.
Application. Spread the prepared IzoKrist mixture over the surface using brush preliminary soaked with water. While the water is not completely soaked and no crystals have formed, but the first layer is hard enough, apply the second layer. This process may take 3-5 minutes, depending on the ambient temperature. Anyway, the time between applications of the layers should not exceed 6 hours.
Recommendations. It is necessary to prevent quick drying of the surface after application of the IzoKrist product. Substances has been moisture-retaining features should not be used. The surface should be kept wet within 5-7 days by regular splashing water on it. Water reservoirs should be filled with water after application of IzoKrist product, to prolong the period of crystallization and to increase the effect of the mixture upon the deepest layers of the base surface. IzoKrist applied at +230C temperature achieves the design mechanical strength in 1 day, waterproofing features in 7 days, and final hardening in 14 days.
First layer consumption: 1.2 kg/m2 powder product
Second layer consumption: 1.0 kg/m2 powder product
The product can be stored during 12 months packed in original sacks in dry and cold conditions. For the short storage period the sacks can be placed on wooden racks one upon the other in three layers, and in the time of application the lower layer sacks should be used first. In case of long-term storage the product packages should not be laid one upon another.
After registering on the site, you will be able to track the status of orders, your personal account and other new features
Məhsul haqqında rəy əlavə edin