Cement-based monocomponent flooring mixture, rich in chemical mixtures, providing formation of imporous surface. It is levelled in a self-spreading manner.
Cement-based monocomponent flooring mixture, rich in chemical mixtures, providing formation of imporous surface. It is levelled in a self-spreading manner. The product conforms to the requirements of the AZS 039-2000 (TS 11140-1993) standard.
This product can be applied in the following areas:
Preparation of surface. Please pay attention to the surface to be checked and strong and removed of residues preventing adhesion. In case the surface has cracks or pores, they should be filled with Filkret repair mortar. The surface should be primed with Binmader primer to reduce the ability of water absorption of the surface and increase its resistance.
Preparation of mixture. Gently pour out 20 kg dry mixture onto 4,0 liter water, and mix until balls and air bubbles disappear (to prepare the mixture it is recommended to use poor circulation mixer).
Application. Pour the prepared liquid mixture onto the surface. To remove air bubbles from the mixture during the application, and facilitate the levelling procedure, use prickly roller. If required, a steel trowel can be used to accelerate levelling. In case it is required to obtain 20,0 mm thickness, the MA Şap product should be applied in 2 layers. The period between the layers may be 60-90-minutes depending on the temperature. The surface applied with the product should be protected from wind and direct sun for 24-hour period.
Recommendations. In case the MA Şap product ambient temperature is within +50C and +300C, a required temperature should be provided. The product should not be used in hot (more than +300C), rainy and windy weather conditions. After use all appliances and tools should be cleaned with water.
Color |
Grey |
Operating temperature |
+50 C - +300 C |
Water /dry mixture ratio |
4,0 liter of water /20 kg dry mixture |
Useful life |
35 minutes |
Application thickness |
10,0 – 30,0 mm |
Hardening period:
|
In 15-30 minutes In 60-90 minutes |
Compression strength limit:
|
3,0 MPa 20,0 MPa 30,0 MPa |
Adhesion |
2,0 MPa |
Period of putting into operation |
In 6 hours the surface can be open for movement. In 24 hours carpet, parquet, tiles, etc. can be applied onto the surface. |
Packing |
20 kg sacks made of 2 or 3-layer kraft paper and 1 layer of polyethilene |
The product consumption for 1 m2 surface area with 1mm thickness is 1,75 kg.
The product can be stored during 12 months in dry conditions, with maximum 10 sacks laid one on another.
After registering on the site, you will be able to track the status of orders, your personal account and other new features
Məhsul haqqında rəy əlavə edin