phone *4500 Order by phone
0
cart My basket
The basket is empty
success In stock -  999  pcs.
About the product:

Ready for application plugging plaster, includes a special composition of cement and sand, to be used in water soakage areas insulation, mounting and repair works, increases adhesive force, quickly expands and hardens when mixed with water.

Features

Product description

Ready for application plugging plaster, includes a special composition of cement and sand, to be used in water soakage areas insulation, mounting and repair works, increases adhesive force, quickly expands and hardens when mixed with water.

Fields of Application

This product can be applied in the following areas:

  • indoor and outdoor areas;
  • floorings and walls;
  • repair of cracks which do not tend to grow;
  • insulation of water soakage areas;
  • insulation of pipes;
  • repair of concrete sulfates;
  • filling and plugging areas with possible water soakage before insulation;
  • strengthening iron cavities inside moulds;
  • oval shaping of concrete edges and corners, repair of joints;
  • fastening metal anchor bolts and elements.

Advantages

  • Monocomponent;
  • To be mixed with water only;
  • Provides protection from water soaking due to quick hardening;
  • Easy application;
  • Once expanded the product forms a good waterproofing layer;
  • Durable and stable;
  • Insulation materials can be applied in 15 minutes after the product application;
  • Does not contain chlorine, so does not cause corrosion of steel structures.
  • Suitable for reliable application in potable water reservoirs.

Application procedures

Preparation of the surfaces. The surfaces to be used should be healthy, rigid, clean, dust-free, and should have suitable dimensions. The surface should be totally free of any fat, rust, paraffin, and other substances deteriorating adhesive force, and should not have small splinters. Edges of cavities and cracks  20 mm depth and width should be cut upright. The V-shape cavities with sharp cut corners are not allowed.

Preparation of mixture. Pour the required amount of the product into clean mixing container, and add the required amount of water during 60 seconds. Put on protective gloves and mix within maximum 30 seconds. Do not add any chemical substances to the mixture.

Attention: If the product is applied in cool weather conditions, then hot or warm water should be used. Add 1 kg of the IzoKontakt 1 product to 0.24-0.28 liter of pure water and mix (amount of water can change depending on the ambient temperature).

Application. Enlarge the areas soaked with water to the width by 20 mm. Mix the product with required amount of water in your  hands. When the mixture is warmed up, quickly apply it to cracked areas and areas where the water soaks. Put hand over the treated place and wait for 60 seconds. Carefully remove the hand after the product starts to harden. In case of larger cavities this procedure can be repeated from the cavity’s edges towards its center. Immediately after application the extra product should be removed from the cavity edges.

The product can be used for the purpose of insulation in the joints between walls and floor. Enlarge the joints to the width and depth by 20 mm minimum. Remove any wire, lead, wooden, and other small particles from the enlarged areas. Fill the joints with the IzoKontakt 1 product in appropriate manner. To fasten the metal anchor bolts and/or fastening elements to concrete surface drill a hole larger than the size of anchoring element in concrete surface using mechanical tools. Then clean the hole inside.

Before application of the IzoKontakt 1 wet the holes with required amount of water. Then fill the holes with the IzoKontakt 1 product. Quickly put metal anchor bolts and/or fastening elements to their places moving them in vertical direction, then apply products has been moisture-retaining features.

Recommendations. In case the ambient temperature in the area of IzoKontakt  1 application is below +50C and above +320C, the required temperature should be provided. The treated surface should be kept wet for 15-minute period. For dry surfaces and surfaces with high water absorption ability this period should be 30 minutes. After hardening the product can be removed by mechanical means only.

Consumption

Differs depending on dimensions of the water soaked areas.

Shelf Life and Storage Method

The product can be stored during 6 months from the manufacturing date packed in original sacks in dry and cold conditions, protected from freezing. Unpacked product should be used within one week.

Warnings

  • Unpacked product should be used within one week;
  • when using the product wear appropriate protective clothing, safety gloves, glasses, and respirators;
  • immediately rinse with water in case of contact with skin or eyes; in case you swallow the product, consult a physician;
  • keep the product away from food and children;
  • parameters indicated above have been received on the basis of laboratory tests conducted in the ambient conditions of +230C±20C temperature and 50% + 5% humidity. Depending on the actual ambient conditions these parameters are subject to change.

Warranty and technical support

  • information indicated in technical specifications is based on scientific and experimental data;
  • Matanat А company is responsible for the product quality only;
  • with the exception of cases of works executed under the supervision of the company specialists, Мatanat  А company shall not be liable for any problems occuring due to improper use of the product by other persons;
  • the company reserves the right to make changes in its product in consequence of scientific-and-technical development;
  • for technical support and/or more information please do not hesitate to contact the Matanat А company!

Məhsul haqqında rəy əlavə edin

CALCULATOR

Call me
I forgot the password
REGISTRATION

After registering on the site, you will be able to track the status of orders, your personal account and other new features